Services for You Water & Wastewater Projects/studies Details
Menu
Dereham Centre – Water Treatment Facility (WTP) Class EA Study

Start Date: September 2019
Completion Date: April 2020 ( Anticipated Public Review Period )

Purpose:

The purpose of this Schedule B Class EA Study is to implement new filtration equipment at the Dereham Centre WTF to reduce both iron and arsenic levels in the groundwater.

Scope:

The proposed WTF upgrade to incorporate filtration will introduce process residuals which require management. Accordingly, this Schedule B Class EA Study will include evaluation of residual/backwash management alternatives.

Status: Upcoming

Study Area Map:
View Map

Contacts:
Jesse Keith, P.Eng. Project Engineer, Oxford County Public Works

Anna Comerton, Ph.D., P.Eng. Manager, Water Planning & Studies, Associated Engineering

Email Contact